Lace Brunsden
August 11, 2025 at 12:02 amProcess tip that prevented a week of rework. Start with a pilot and a single success metric. Design the rollout so rollback takes minutes, not hours.
Process tip that prevented a week of rework. Start with a pilot and a single success metric. Design the rollout so rollback takes minutes, not hours.